Simrad SP270 Installationshandbuch Seite 128

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 254
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 127
Simrad SP 270
M~.J~~"
F~~,
I;~9JJ!~it~,
c~lculations in table 2, and enter the
results
of the 20
logr and the U Hydr. into table
3. Also fill in
the M total
from table 1 into table 3.
SL = UHydr - M
+ 20 logr
U Hydrophone dB//l V
OMNI
M total
dB//IV/~Pa
209.
20 log r
17.
SL OMNI dB/ /~Pa
217.
U Hydrophone dB/ /1 V
110
M total
dBI /1 V
/~Pa 209.
20 log r
17.
SL 110 dB//~Pa 223.
Table Source Level (SL) for OMNI
and
110
Make the SL calculations
, and
compare the result with the
specifications for the sonar:
SL OMNI:
SL 110
217 :f: 1 dB//~Pa
223 :f: 1 dB//~Pa
Note! DO NOT remove the hydrophone from the
position used for the
source level measurements. This
known position should also be
used for the receiving voltage response
(VR) measurements in
the next chapter.
When finished with the measurements
, remember to move the
wires in cable pair no. 6 in the Transceiver Unit back to the
following positions:
- Red
wire on E201-49 should be moved back to E201-
31.
- Blue
wire on E201-
46 should be moved back to E201-
33.
Cable screen should be connected to E201-35.
160573/A
Seitenansicht 127
1 2 ... 123 124 125 126 127 128 129 130 131 132 133 ... 253 254

Kommentare zu diesen Handbüchern

Keine Kommentare