Simrad SP270 Installationshandbuch Seite 91

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 254
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 90
Start-up procedures
160573/A
PREPARI.
NG,..:tHi
TART
Before start-up
check list
Before beginning with the
start-up procedure, check the
following:
Sonar Control Unit:
Check that no connections are made to the Sonar Control
Unit.
Transceiver Unit:
Check that the ship s mains fuses to the
Transceiver Unit
are disconnected.
Check that the mains input connector
P20 1 on the
power
supply in the Transceiver Unit is disconnected.
Check that the transducer plug is not connected to the
left- hand side of the transceiver PCBs.
Hull Unit:
Check that the ship
s mains fuses to the Hull Unit are
disconnected.
Seitenansicht 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 253 254

Kommentare zu diesen Handbüchern

Keine Kommentare