Installation procedures
11
851-160572 / B
Installation checklist
For the following check list, refer to the sonar room
requirements in chapter Sonar room require ments .
YES NO
Are the access hatches satisfactory?
Is the heating satisfactory?
Is the insulation satisfactory?
Is the ventilation satisfactory?
Is the staying of the Hull Unit s atisfactory?
Is a bilge pump installed?
Is the lighting satisfactory?
Is the sonar room suitably floored?
Is the air vent pipe satisfactory?
If the answer to any of the questions is NO, make a note in the
installation certificate at the end of section Start-up procedure.
Kommentare zu diesen Handbüchern